Our services / Company training

SMED training: analyse and improve machine changeovers

SMED training develops a team's ability to analyse a changeover, remove avoidable downtime and establish a repeatable method. Participants work through preparation, internal and external tasks, organisation and standardisation.

The analysis follows the time from the last good item of one run to the first good item of the next. A shorter mechanical adjustment alone may not improve the result if searching, waiting or repeated quality adjustments still delay production.

SMED team analysing and standardising a machine changeover

What participants will be able to do

  • Observe a complete changeover and record tasks, time and responsibilities.
  • Separate internal activities from work that can be prepared externally.
  • Develop and evaluate improvements without weakening safety or quality controls.
  • Create a changeover standard and check it across repeated runs.

Programme: practical modules

We agree the final scope around the team's experience, the selected process and the problem to solve.

01 · Define and observe the changeover

Agree the start and end points and capture the sequence as it happens. Include preparation, movement, waiting, adjustments and first-piece checks.

02 · Separate internal and external work

Identify which tasks require the equipment to be stopped and which can take place before or after the stoppage. Examine the reasons rather than accepting current practice as a fixed requirement.

03 · Improve external preparation

Ensure the right tools, materials, information and people are ready. Define where items are located, who prepares them and how readiness is checked.

04 · Reduce and simplify internal tasks

Evaluate task sequence, adjustments, fastening and suitable parallel work. Check feasibility with the people responsible for equipment, safety and product quality.

05 · Standardise the new method

Describe roles, sequence, parameters and checks in a form the team can use. Connect the standard with instruction and practice for the people performing the changeover.

06 · Run a pilot and review variation

Test the proposed method, compare results with the starting point and investigate remaining delays. Repeat observations to check whether the new result is stable.

Who is it for?

Operators, setters, supervisors, maintenance, engineering, quality and internal logistics. A cross-functional group can address preparation and approval delays that the machine team cannot resolve alone.

How to prepare

Choose a recurring changeover and provide access to the process or an agreed recording, current timings and quality requirements. Involve the people who perform the changeover and approve technical changes.

How the training works

Participants learn the method and apply it to a selected changeover. They develop improvement proposals, assign responsibilities and prepare a standard that can be tested in a pilot.

How to measure progress

Compare complete changeover time and its variation across runs, lost production time and first-piece quality. The target is agreed from the actual process; a workshop does not guarantee a particular percentage reduction or a sub-ten-minute result.

Frequently asked questions

What does SMED stand for?

Single-Minute Exchange of Die describes the ambition to reduce changeovers to single-digit minutes. The practical method is useful even when the realistic target for a particular process is longer.

Can every internal activity be moved outside the stoppage?

No. Technical, safety and quality requirements still apply. The team should test each proposal with the relevant responsible people.

How long does SMED training take and what does it cost?

The scope and quotation depend on the changeover, group, observation opportunities and depth of practical work. We agree the schedule before the programme.

How do we keep the improvement?

Use an agreed standard, prepare consistently and train the team. Review deviations and update the method when equipment, materials or product requirements change.

Related expertise and next steps

For scheduled editions, check open workshops and confirm the delivery language shown for the selected event. Company programmes are scoped individually.

Build a programme around your team's challenge

Tell us about the process, the people involved and the result you want to improve. We will agree a practical scope and the next step.